Step-by-Step Paving Process

Proper installation ensures the 8-year warranty holds up. Follow this 4-step method standard:

Step 1: Site Leveling and Hardening
A hard foundation is required (cement, asphalt, or concrete). Paving can be carried out directly on hardened ground. If the ground is not hardened, it must be hardened in advance to prevent subsidence.

Step 2: Lay Large Turf Panels First
Transport the large turf panels to the designated positions. Pro Tip: Before paving, confirm the direction of the turf fibers; the optimal effect is no light reflection when viewed from the main entrance.

Step 3: Adhere the Seams with Glue
Apply adhesive along the center seam and onto the joining tape. Wait until the adhesive becomes slightly dry (tacky), then attach the joining tape to the seam. Apply another layer of adhesive onto the joining tape, and when it turns slightly tacky, press the artificial turf onto the tape to finish the splicing.

Step 4: Adjust Details and Compact the Turf
When the adhesive is about to set, manually press the area back and forth to ensure the seam edges bond tightly with the joining tape. Groom the turf fibers with a power broom to lift the artificial turf colors and inspect for perfection.

agsturf Avatar

Leave a Reply

Your email address will not be published. Required fields are marked *

agsturf

AGS Turf supplys highest quality artificial grass with factory direct price.
Our installation team Artificial Grass Solution became a licensed contractor in 2016 and ranked five-star on Yelp!